田湾核电站安全壳预应力张拉技术
PRE-TENSIONING TECHNOLOGY FOR THE SAFE SHELL OF TIANWAN NUCLEAR POWER PLANT
 全文: PDF (0 KB)   HTML (1 KB)  输出: BibTeX | EndNote (RIS)      背景资料
摘要 田湾核电站安全壳预应力实际张拉力达11. MN,为国内最大吨位预应力,钢束最长为178.42 m,属超长预应力钢束。锚具部件的安装包括竖向钢束、水平钢束。筒体墙和穹顶水平钢束初步张拉采用等应力张拉,主张拉采用C1500 F千斤顶。张拉结束后,锚固夹片并将荷载传递至锚块上,检查滑动量后二次紧固。筒体墙竖向钢束采用两端同时张拉方式,张拉程序与水平预应力张拉相同,通过控制千斤顶压力及测量延伸率、夹片拉入值进行预应力张拉质量控制。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
魏建国
关键词安全壳   大吨位   超长束   预应力张拉     
Abstract: Pre-tensioning actually exerted on the safe shell of Tianwan Nuclear Power Plant reaches 11.2 MN, the largest pre-stress at home; and the longest steel restraint is 178.42 M, a super-long pre-stressed restraint. Erected anchor components include vertical restraint and horizontal restraint. The preliminary tensioning of the horizontal restraints of dome and cylinder wall is made with equal stress while the principal tensioning is executed with C1500 F jack. After tensioning, fix the clamp with anchor so as to transfer loads to the anchor, and then retighten it after checking the sliding movement. The vertical restraint of the cylinder wall is tensioned from both ends simultaneously in a sequence same as that for the horizontal pre-tensioning. By controlling jack pressure and measuring elongation percentage as well as tensioning value of the clamp, pre-tensioning quality is controlled.
Key wordssafe shell   big tonnage   super-long restraint   pre-tension   
引用本文:   
魏建国. 田湾核电站安全壳预应力张拉技术[J]. 建筑技术, 2005, 36(4): 265-267.
WEI Jianguo. PRE-TENSIONING TECHNOLOGY FOR THE SAFE SHELL OF TIANWAN NUCLEAR POWER PLANT[J]. Architecture Technology, 2005, 36(4): 265-267.
链接本文:  
http://www.jzjs.com/CN/     或     http://www.jzjs.com/CN/Y2005/V36/I4/265
 
没有找到本文相关图表信息
没有本文参考文献
[1] 李亚文, 程晓光, 束七元, 李勇会. 污水处理厂卵形消化池无粘结预应力施工技术[J]. 建筑技术, 2012, 43(12): 1083-1085.
[2] 高玉兰, 董 巍, 王益民, 迂长伟. 大面积楼板安装大吨位钢管柱“两滑一提”施工技术[J]. 建筑技术, 2008, 39(2): 118-.
?
版权所有 © 2011 建筑技术杂志社
地址:北京市广莲路1号建工大厦A座9层,邮编100055 电话:(010)68512449 (010)63928687,63928688 e-mail:jzjs@sina.com
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn