Abstract:
In Wenzhou Zhixin Square engineering, large-diameter super-long bored filling pile is used, appropriate construction technology, key construction points and key techniques are determined, the quality of foundation piles is guaranteed according to the complicated geological conditions on the engineering site. The qualification rate of pile body in low-strain inspection is 100%, total settlement is less than 8mm and RMB 1.03 million are saved.