Abstract:
The thesis introduce the smooth blasting technology used in the 2nd undersea jacking pipe of Shantou water supply go through the seabed terrane. The circumjacent terrane was controled effectively by increasing the blasting holes around the section and sectional blasting method and also the tegrate foundation strengthening technique. The pipe have gone through the 50m middle layer of weathering granitic layer successfully.