Abstract:
The process of hydraulic climbing formwork in the construction of core tube of super high-rise building is becoming perfect, it has such characteristics as fast construction, favorable engineering quality and low cost, etc. In the construction of Hebei Kaiyuan International Centre engineering, construction sequences are arranged reasonably to realize tri-dimensional cross construction, and multiple safety measures are adopted to treat detail nodes. Space, time, equipments and labors are effectively used to improve the labor efficiency and quicken the construction schedule.