Abstract:
Combination of the the building properties, site engineering geological and hydrogeological conditions, after the technical and economic comparison of the foundation type and ground reinforcement method of a high-rise building, it was decided to adopt water vibro-crushed stone piles to remove the liquefied sand layer, and to improve the ground bearing capacity. Through on-site testing, it showed that the ground reinforcement was successful.