Abstract:
The capacity, of desalination water pool in 106t/a ethylene project of Sinopec Tianjin Company reaches 44000m3, and composite pile foundation is adopted. Leakage is detected in water storage test and it is repaired by using the method given in the code and relevant measure to successfully satisfy the design requirements and deliver for acceptance.
HU Yong-yi,ZHOU Ran,ZHANG Da-qing. REASON AND REPAIR METHOD FOR LEAKAGE AT DEFORMATION
JOINT OF 40 000 m3 CAST-IN-PLACE CONCRETE WATER POOL[J]. Architecture Technology, 2012, 43(12): 1111-1113.