Abstract:
In the residential building 33 project of Zhongnan Century Town, the vertical member adopts prefabricated PC plate which is connected by using slurry anchorage method, and it is connected with the horizontal member through reinforced post-poured concrete. Construction process and quality control requirements of PC plate are introduced, such as prefabrication, stripping, installation, adjustment and connection with horizontal member, etc., providing experiences and references for related projects.
YAN Jin-zhou,DONG Nian-cai. FABRICATION AND INSTALLATION QUALITY CONTROL OF PC PLATE
IN BUILDING 33 OF ZHONGNAN CENTURY TOWN[J]. Architecture Technology, 2012, 43(4): 316-319.