建筑技术
 
 
建筑技术  2012, Vol. 43 Issue (6): 509-511    DOI:
混凝土结构工程 最新目录 | 下期目录 | 过刊浏览 | 高级检索
0.8m×4m高大截面梁模架施工及安全监理
CONSTRUCTION AND SAFETY SUPERVISION OF 0.8m×4m BEAM FORMWORK WITH HIGH AND LARGE CROSS SECTION
 全文: PDF (0 KB)   HTML (1 KB)  输出: BibTeX | EndNote (RIS)      背景资料
摘要 中国海关博物馆地下体能训练中心层高超过8 m,模板支撑高度大且截面尺寸大,属超高支撑、大跨度、大截面高支撑模板体系,搭设难度大、危险性高。施工中落实多项脚手架安全技术措施,强化现场安全监理工作,确保了模架施工安全。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
崔智
王东魁
王勐
王凯旌
关键词模板工程   大截面梁   超高模板支撑     
Abstract: Storey height of underground physical training center in China Custom Museum is more than 8m. The formwork support is high and has large cross section, belonging to super-high, large-span and large-section formwork supporting system and producing many difficulties and high risks for erection. During construction, many technical safety measures for scaffold are implemented to strengthen safety supervision on construction site and to ensure framework construction safety.
Key wordsformwork engineering   beam with large cross section   super-high formwork support   
引用本文:   
崔智,王东魁,王勐等. 0.8m×4m高大截面梁模架施工及安全监理[J]. 建筑技术, 2012, 43(6): 509-511.
CUI Zhi,WANG Dong-kui,WANG Meng et al. CONSTRUCTION AND SAFETY SUPERVISION OF 0.8m×4m BEAM FORMWORK WITH HIGH AND LARGE CROSS SECTION[J]. Architecture Technology, 2012, 43(6): 509-511.
链接本文:  
http://www.jzjs.com/CN/     或     http://www.jzjs.com/CN/Y2012/V43/I6/509
 
没有找到本文相关图表信息
没有本文参考文献
[1] 彭晓月, 张俊恩. 特大型储煤筒仓高支模施工技术[J]. 建筑技术, 2014, 45(7): 663-665.
[2] 董 林, 陈芝轩, 焦伦杰. 重载超高模架在昆明机场工程中的应用[J]. 建筑技术, 2012, 43(12): 1089-1091.
[3] 刘京城, 白克利, 李辉坚, 王念念, 贾成亮. 邯郸文化艺术中心超高重型群体模架施工技术[J]. 建筑工人, 2011, 42(11): 978-983.
[4] 马永乐, 冯康见. 工具型竖井自爬模架[J]. 建筑工人, 2011, 42(11): 973-977.
?
版权所有 © 2011 建筑技术杂志社
地址:北京市广莲路1号建工大厦A座9层,邮编100055 电话:(010)68512449 (010)63928687,63928688 e-mail:jzjs@sina.com
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn