Abstract:
The steel structure of an office building in Beijing is located on 2F-10F floors between the main structures of north and south buildings and is installed by an integrative method of routine lifting by tower crane, uplifting by double cranes and automatic lifting. During construction, relevant safety monitoring measures are established and countermeasures for problems encountered in lifting are adopted. Favorable construction effects are obtained.
SHOU Jian-shao. CONSTRUCTION AND SAFETY SUPERVISION FOR LIFTING OF SUPER-LONG STEEL COMPONENT ON NARROW SITE[J]. Architecture Technology, 2012, 43(6): 531-533.