Abstract:
An engineering project of Beijing adopts high-rise cast-in-place concrete shear wall staggered floor structure. Structural construction quality is improved, construction period is shortened and construction efficiency is increased through changing the construction connection position between longitudinal structure and horizontal structure, adjustment of construction sequence of longitudinal structure at position where elevation is changed, and increase of formwork supporting times.