建筑技术
 
 
建筑技术  2012, Vol. 43 Issue (9): 791-793    DOI:
工程质量与监控 最新目录 | 下期目录 | 过刊浏览 | 高级检索
穿越京杭运河输水管道顶管施工质量控制
QUALITY CONTROL FOR PIPE JACKING CONSTRUCTION OF WATER SUPPLY  PIPELINE PASSING THROUGH BEIJING-HANGZHOU GRAND CANAL
 全文: PDF (0 KB)   HTML (1 KB)  输出: BibTeX | EndNote (RIS)      背景资料
摘要 杭州市余杭仁和水厂供水工程穿越京杭运河顶管施工中,根据地质情况采取技术措施,在淤泥质粉质粘土中进行180m长钢管顶进,不设中继间且不采用注浆减阻措施,取得了一次顶进成功,质量控制达到预期目标。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
张洪涛
郑重
关键词沉井   顶管施工   纠偏措施   质量验收     
Abstract: During pipe jacking construction of Yuhang Renhe Water Plant project of Hangzhou passing through Beijing-Hangzhou Grand Canal, technical measures are adopted according to geological conditions. 180m-long steel pipe is jacked in silty clay stratum without relay chamber and fraction-reducing measure. Successful one-off jacking is realized and expected quality control aims are reached.
Key wordswell sinking   pipe jacking construction   deviation-correction measure   quality acceptance   
引用本文:   
张洪涛,郑重. 穿越京杭运河输水管道顶管施工质量控制[J]. 建筑技术, 2012, 43(9): 791-793.
ZHANG Hong-tao,ZHENG Zhong. QUALITY CONTROL FOR PIPE JACKING CONSTRUCTION OF WATER SUPPLY  PIPELINE PASSING THROUGH BEIJING-HANGZHOU GRAND CANAL[J]. Architecture Technology, 2012, 43(9): 791-793.
链接本文:  
http://www.jzjs.com/CN/     或     http://www.jzjs.com/CN/Y2012/V43/I9/791
 
没有找到本文相关图表信息
没有本文参考文献
[1] 范正根,米亚琼,舒超超. 逆向排水沉井式护壁在人工挖孔桩中的应用[J]. 建筑技术, 2016, 47(7): 634-.
[2] 陆凤池,熊森,叶海桃. 沉井水平承载力性能研究[J]. 建筑技术, 2016, 47(6): 499-.
[3] 王爱兰,李军石,王 仑,张红. 装配整体式混凝土剪力墙结构质量控制与验收要点[J]. 建筑技术, 2015, 46(3): 216-.
[4] 王彦辉. 雨水泵房沉井施工技术[J]. 建筑技术, 2012, 43(3): 217-219.
[5] 胡保刚;朱国防;职晓云. 《房屋渗漏修缮技术规程》(JGJ/T53-2011)修订综述[J]. 建筑工人, 2011, 41(7): 582-584.
?
版权所有 © 2011 建筑技术杂志社
地址:北京市广莲路1号建工大厦A座9层,邮编100055 电话:(010)68512449 (010)63928687,63928688 e-mail:jzjs@sina.com
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn