Abstract:
The Watch Tower Project in Beijing Olympic Park is a high-rise steel structure with a huge volume. After careful calculation, it is determined to use steel sheet composite shear wall structure, which could not only bear the load of upper part, but also integrate with the tower base to stabilize the tower body. Under precondition of ensuring structure safety, building functions are successfully realized and ideal application effects are obtained through adoption of a series construction techniques, including steel column installation, steel sheet wall installation, steel bar binding, formwork installation, concrete pouring, formwork dismantlement and next steel bar binding, as well as successful disposal of difficulties in connection between steel bar and steel sheet.
YANG Bing-jun,JIAO Yong,XU De-lin et al. APPLICATION OF ARCH STEEL SHEET CONCRETE COMPOSITE SHEAR WALL CONSTRUCTION TECHNIQUE IN BEIJING OLYMPIC PARK TOWER PROJECT[J]. Architecture Technology, 2013, 44(1): 31-33.