Abstract:
There are many post-pouring concrete belts in the foundation of Guomai Building project and improper construction may easily cause cracks and water leakage. During construction, post-pouring belt blocking method is optimized and high ribbed formwork is used to block both sides of post-pouring belt and successfully prevent concrete leakage; supporting method is improved to realize stable and balanced forces on both sides of beam slab, effectively control settlement and ensure the integrity and construction quality of post-pouring belt.
DU Zhi-qiang. FORMWORK CONSTRUCTION TECHNIQUE FOR POST-POURING CONCRETE BELT IN GUOMAI BUILDING PROJECT[J]. Architecture Technology, 2013, 44(5): 460-463.