VC&PE Tower is the first governmentally-invested project applying BIM technique, which is introduced after original construction drawing design and general contract bidding are over. The introduction of BIM technique successfully eliminates visa and investment wastes caused by errors, neglect, conflict and insufficiency in original construction drawing. But the introduction of BIM technique is a little later and it doesn't eliminate on-site design changes, so BIM technique shall be used earlier in project construction. The introduction of BIM technique could gradually realize zero change and zero visa, which is an ideal state of project construction. Meanwhile, it could promote more active and accurate investment control.
DU Wei-ping,SUN Hai-long. APPLICATION AND THOUGHTS ABOUT BIM IN HIGH-RISE STEEL STRUCTURE BUILDING PROJECT[J]. Architecture Technology, 2014, 45(6): 524-525.