Abstract:
In the bridge project on Huandao West Road, the roads over which the bridge passes are divided. Due to the fact that this project involving work passing through under integrated pipeline trenches, watercourse is redirected temporarily, as well as cleaned, after general consideration of bridge pile foundation construction. Meanwhile, the soft foundation and bridge piles are treated to guarantee reliable construction quality.
XIE Fei,YE Zhi-xiang. CONSTRUCTION TECHNIQUE OF DEEP AND THICK SILTY WATERCOURSE PILES UNDER COMPLEX CONDITIONS[J]. Architecture Technology, 2014, 45(6): 562-564.