Abstract:
During construction of Al Hikma Tower in Dubai, the area of single storey is small and routine construction method could not be used for normal flow construction, so hydraulic climbing formwork system is used after analysis. This climbing formwork technique could not only guarantee construction schedule and increase construction efficiency, but also reduce construction cost and improve construction quality, providing favorable conditions for smooth construction.
ZHANG Guo-guang. APPLICATION OF CLIMBING FORMWORK SYSTEM IN CONSTRUCTION OF AL HIKMA TOWER PROJECT OF DUBAI[J]. Architecture Technology, 2014, 45(8): 693-695.