建筑技术
 
 
建筑技术
地铁与市政工程施工技术 最新目录 | 下期目录 | 过刊浏览 | 高级检索
跨河钢箱梁桥临时支墩的设计、施工及验收
DESIGN, CONSTRUCTION AND ACCEPTANCE OF TEMPORARY PIER FOR CROSS-RIVER STEEL BOX STEAM BRIDGE
 全文: PDF (0 KB)   HTML (1 KB)  输出: BibTeX | EndNote (RIS)      背景资料
摘要 北京通惠河新建桥工程安装跨河桥钢箱梁时,需设置钢管柱临时支墩。施工前编制了临时支墩方案并进行安全验算,对支墩基础进行处理,吊装钢箱梁前对临时支墩进行验收,通过过程控制保证了施工质量与安全。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
许彦朴
韩立波
高云东
关键词跨河桥   临时支墩   安全验算     
Abstract:  Temporary steel pipe column pier shall be set during installation of cross-river steel box beam of new bridge over Beijing Tonghui River. Temporary pier scheme is prepared and safety verification is carried out before construction before treatment of pier foundation. Temporary pier is accepted before lifting of steel box beam. Construction quality and safety are effectively guaranteed through process control.
Key words

margin-bottom: 0pt" class="p0">font-size: 10.5pt    cross-river bridge; temporary pier; safety verificationmso-spacerun: 'yes'"> cross-river bridge; temporary pier; safety verificationfont-size: 10.5pt   ')" href="#">mso-spacerun: 'yes'">   

引用本文:   
许彦朴,韩立波,高云东. 跨河钢箱梁桥临时支墩的设计、施工及验收[J]. 建筑技术, 2014, 45(9): 786-788.
XU Yan-pu,HAN Li-bo,GAO Yun-dong. DESIGN, CONSTRUCTION AND ACCEPTANCE OF TEMPORARY PIER FOR CROSS-RIVER STEEL BOX STEAM BRIDGE[J]. Architecture Technology, 2014, 45(9): 786-788.
链接本文:  
http://www.jzjs.com/CN/     或     http://www.jzjs.com/CN/Y2014/V45/I9/786
 
没有找到本文相关图表信息
没有本文参考文献
没有找到本文相关文献
?
版权所有 © 2011 建筑技术杂志社
地址:北京市广莲路1号建工大厦A座9层,邮编100055 电话:(010)68512449 (010)63928687,63928688 e-mail:jzjs@sina.com
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn