Abstract:
The cast-in-place box beam of a 3-level complete interchange viaduct(midspan)is 3m high and full framing cuplock scaffold is adopted. It is a large-scale project with high risks. Special scheme for scaffold construction is discussed and examined to verify the stability of upright scaffold and integral anti-overturn. Effective safety monitoring is realized through examination of scaffold erection and load test before use.