Abstract:
In a frame shear wall structure project, the basement has relatively high rigidity and basement upfloating due to underground level increase causes building inclination. Considering the condition of foundation bottom after inclination, well point dewatering method is used to control the settlement of building,the sandy soil at foundation bottom is cleared by sand-suction machine. Various monitoring systems, such as longitudinal structural displacement monitoring, integral inclination monitoring and structure stress monitoring, etc., are adopted during inclination correction construction, to successfully realize information-based control of inclination correction and guarantee structural safety and construction safety.
LI?Jin-bao,LI Bi-qing,JIANG Tao et al. CORRECTION TECHNIQUE FOR BUILDING INCLINATION CAUSED BY
BASEMENT UPFLOATING[J]. Architecture Technology, 2015, 46(10): 904-908.