Abstract:
Beijing Greenland Center No.4 office building construction reaching a height of 260 m,with truss transfer layer In 42 and 43 layer,the application of Takla and BIM a combination of technologies for deepening the design truss of steel member,and in processing plants was truss-pre assembled.The truss layer overweight component using slip steel platform innovation measures for lifting. Optimized measures against rebar connecting. Solve truss transfer storey structure was complex and difficult problems of construction, ensures the overall construction schedule and quality of trusses.
ZHANG Liang,ZHANG Li-li,ZHANG Yu-pin et al. CONSTRUCTION TECHNOLOGY OF SUPER HIGH-RISE STEEL STRUCTURE TRUSS TRANSFER STOREY[J]. Architecture Technology, 2015, 46(4): 334-348.