Abstract:
Combined with the plane rotation construction process of long span self-anchored arch bridge in the super-speed railway line which was across existing railway, it analysed the construction support, opposed pulling system, and the dynamic characteristics during and after rotation construction, and with the design value to control the construction process. Monitoring results showed that the construction process control meets the design requirements, the construction process is stable, the construction progress smoothly.
SUN Xiao-yi,HU Juan. Construction Control of Self-anchored Reinforcement Concrete Arch Bridge in Rotation Building[J]. Architecture Technology, 2015, 46(7): 609-.