Abstract:
The swimming hall of Yunnan University of Finance and Economics is of a special structure. This complex structure is supported by 31 steel columns around the facade, requiring high construction accuracy and producing great construction difficulties. During construction, technical preparation was carefully made and technical disclosure was carried out according to the construction sequence, to strengthen the quality control and inspection of critical and special construction steps and to guarantee smooth construction. The external facade successfully satisfied the design requirements.