Abstract:
The artificial landscape mountain in Hefei Wanda Theme Park, its height is about 15 m, with a volume of about 33 000 m3, above the mountain setting track flume ride amusement device and theme packaging. Based on considering the integration of design and construction, comprehensive consideration of the landscape effect, duration and cost factors. In this paper, the soil compaction method of artificial heaping mountain, the stability of the soil slope, the structure of the support structure of amusement device and the interaction between the structure and the mountain, the key link of the construction of the mountain are introduced. As a reference for the similar project.