Abstract:
With introduction of the China ZUN project and 1 590 m horizontal coil pipe experiment, this paper discussed the assessment of concrete pumpability, based on which the type of pumping pipe was selected. Reasonable and effective pumping process and pump washing method were designed according to five principles, such as bench mark principle and identical height principle, etc. Practical and economic significance were realized for improvement of construction quality and efficiency of super-high building.
LI Lu-ming,CHEN Xi-wang,ZHANG Li et al. DISCUSSION ON CONCRETE PUMPING CONSTRUCTION PROCESS OF
SUPER-HIGH BUILDING[J]. Architecture Technology, 2016, 47(4): 335-.