Abstract:
Single-wall steel suspended cage construction method was adopted for construction of the elevated pile foundation of No.2 bridge over Nachao River in Tangshan City. After analysis on four different construction conditions, software modeling was carried out to get the maximum stress of various members. Appropriate measures were adopted during assembly, settlement, blocking, bottom casting and dismantlement of suspended steel cage, to guarantee high construction safety and efficiency.
LIU Cheng-gang,RU Qi-jiang,CHEN Lin et al. Construction Technology Application of Steel Boxed Cofferdam on High-rise Pile Cap in Deep Ocean Area[J]. Architecture Technology, 2016, 47(6): 533-.