Abstract:
Based on a landscape bridge project, this paper analyzed the importance and difficulties in welding deformation, fabrication precision and bridge line shape of alternatively waving steel box beam, proposed relevant solutions and explained the key points of deepening design and processing techniques. The project used CAD modeling technique and distributed whole bridge preassembly scheme, providing assistance for control of important and difficult construction, as well as subsequent construction.