Abstract:
During construction of Grand Convention Hall of Beijing Yanqi Lake International Convention and Exhibition Center, alternative-bay symmetrical pouring and post-pouring belt processes were adopted to prevent concrete crack of dome roof thin shell. Analogue simulation of whole construction process was established to analyze disadvantageous conditions and to realize precontrol of concrete pouring quality. The application result showed that no crack affecting structural function was detected.