Abstract:
During construction of Beijing Yanqi Lake International Convention and Exhibition Center, based on the electric heating compensation mechanism of electric tracing, electric tracing pipeline was pre-embedded in the bond steel fabric to realize sustainable heat supply after concrete pouring. After measurement of concrete strength, it was shown that electric tracing band could be drawn out and be used to the next position after heat supply for seven days. Construction cost was reduced and favorable curing effect was realized.
ZHANG Yang,ZHAO Lei,YANG Jing-ao et al. Electric Tracing Curing Technique for Cast-in-Place Concrete in Winter[J]. Architecture Technology, 2017, 48(6): 576-.