Based on installation of horizontal-jib heavy tower crane in east office building project of Nanning Huarun Center, this paper analyzed the difficulties and relevant measures for installation of horizontal-jib heavy tower crane. Optimal installation processes were introduced on the aspects of tower crane base design, site arrangement, installation sequence, installation equipment selection according to practical site conditions. Installation cost was reduced and installation schedule nodes were guaranteed, realizing favorable practical effect.
TANG Ji-yu,LIN Zhong-he,CHEN Yong-hui et al. Installation Technique of Horizontal-Jib Heavy Tower Crane in East Office Building of Nanning Huarun Center Project[J]. Architecture Technology, 2017, 48(7): 732-.