Abstract:
The newly built Fengtainanlu Station of Beijing subway line 16 has a structure clear distance of 2.4 m to existing Fengtainanlu Station of subway line 9. Structural risk and environmental risk were analyzed during construction to determine construction measures. Construction quality and safety were effectively guaranteed, without any influence on the operation of existing station, successfully realizing smooth construction of new station and structural safety of existing station.