建筑技术
 
 
建筑技术
地铁工程施工技术 最新目录 | 下期目录 | 过刊浏览 | 高级检索
PBA洞桩车站中砂卵石地层防塌孔技术
杜昌隆,段学锋,冯宝家
北京建工土木工程有限公司,100015,北京
Hole Collapse Prevention Technique of PBA Hole Pile Station on 
Sand gravel stratum
DU Chang-long, DUAN Xue-feng, FENG Bao-jia
BCEG Civil Engineering Co., Ltd., 100015, Beijing, China
 全文: PDF (0 KB)   HTML (1 KB)  输出: BibTeX | EndNote (RIS)      背景资料
摘要 目前北京地铁暗挖车站均采用新型PBA洞桩法施工,只保留上层导洞,在上层导洞内采用履带式洞桩钻机成孔,但在砂卵石地层中钻孔极易引起塌孔。北京地铁16号线富丰桥站施工中通过增加导坑深度、孔口加固注浆和保证泥浆质量等方法,成功减少或杜绝了塌孔现象。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
杜昌隆
段学锋
冯宝家
关键词砂卵石地层   PBA洞桩车站   防塌孔技术     
Abstract: Current subsurface excavation subway stations in Beijing were constructed using new Pile-Beam-Arch (PBA) method. This method only reserves the upper pilot tunnel, in which crawler-type hole pile driller to drill hole, but drilling hole in sand gravel stratum may cause hole collapse easily. During construction of Fufengqiao Station of Beijing subway line 16, various measures, such as increasing pilot hole depth, strengthening grouting at hole top and ensuring slurry quality, etc., were adopted to successfully reduce or eliminate hole collapse phenomenon.
Key wordssand gravel stratum   PBA station   hole collapse prevention technique   
引用本文:   
杜昌隆,段学锋,冯宝家. PBA洞桩车站中砂卵石地层防塌孔技术[J]. 建筑技术, 2018, 49(11): 1172-.
DU Chang-long,DUAN Xue-feng,FENG Bao-jia. Hole Collapse Prevention Technique of PBA Hole Pile Station on 
Sand gravel stratum[J]. Architecture Technology, 2018, 49(11): 1172-.
链接本文:  
http://www.jzjs.com/CN/     或     http://www.jzjs.com/CN/Y2018/V49/I11/1172
 
没有找到本文相关图表信息
没有本文参考文献
[1] 段学锋,杜昌隆. 砂卵石地层有限空间内的干成孔技术[J]. 建筑技术, 2018, 49(11): 1169-.
[2] 薛洪松. 砂卵石地层深孔注浆地面隆起管控措施[J]. 建筑技术, 2018, 49(11): 1188-.
[3] 马云新. 砂卵石地层盾构辐板式刀盘的特点及掘进技术[J]. 建筑技术, 2017, 48(6): 591-.
[4] 王锡军. 无水砂卵石地层盾构施工[J]. 建筑工人, 2011, 42(03): 217-220.
?
版权所有 © 2011 建筑技术杂志社
地址:北京市广莲路1号建工大厦A座9层,邮编100055 电话:(010)68512449 (010)63928687,63928688 e-mail:jzjs@sina.com
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn