Abstract:
In the construction of the underground continuous wall of the main body of the Peijiaying Station of the R3 line of Jinan City Rail Transit, the model of the hoisting equipment of the ultra-deep and overweight underground continuous wall, the position of the lifting point and the specifications of the hanging ribs were determined through mechanical analysis and calculation; selection and lifting point design.
XIE Shen-ju,GUO Peng-fei,YU Xing-chen. Arrangement and calculation of lifting points for super deep and
heavy underground continuous wall steel cage[J]. Architecture Technology, 2018, 49(11): 1201-.