APPLICATION OF SUPER-LENGTH CONCRETE STRUCTURE LATE
POURED BAND CONSTRUCTION TECHNIQUE
ZHAO Qing-feng1, ZENG Sheng2
1.China Railway the 10th Bureau Corp, 250032,Ji`nan,China; 2.School of Nuclear Resources and
Nuclear Fuel Engineering, University South of China,421001,Hengyang,Hu`nan,China
Abstract:
Setting post-pouring belt is a commonly-used method for construction and design of reinforced concrete structure at present, and various problems about post-pouring belt are usually encountered during quality inspection. The reinforced concrete structure of Chengdu Subway Line 1 Control Center Building has 2,246m temperature post-pouring belt and 583m subsidence post-pouring belt, the structure belongs to a super-long concrete post-pouring belt structure. The quality of post-pouring belt is guaranteed and favorable economic benefit is realized through adoption of convenient template with closing-up net.
DIAO Qiang-Feng,Ceng,CHENG. APPLICATION OF SUPER-LENGTH CONCRETE STRUCTURE LATE
POURED BAND CONSTRUCTION TECHNIQUE[J]. Architecture Technology, 2011, 42(02): 120-123.