Abstract:
Underground parking lot of Shenzhen Mangrove West Coast project covers an area of about 7,3000m2. 1mm thick epoxy resin self-leveling floor and 4mm thick color sand-suppression wear-resisting floor are adopted separately according to different traffic flows. Common quality defects of floor made of cement mortar or pea gravel concrete that may be seriously damaged after services for a long period can be successfully prevented and favorable effects have been realized.
DAN Wei-Guo,Hu-Zhen-Xiang,Bang et al. CONSTRUCTION TECHNIQUES OF WEAR-RESISTING FLOOR AT UNDERGROUND PARKING LOT OF SHENZHEN MANGROVE WEST COAST[J]. Architecture Technology, 2011, 42(02): 127-130.