国内外早拆模板技术发展概况
糜嘉平
中国模板协会,100088,北京
Introduction on technical development of early-strip formwork both home and abroad
MI Jia-ping
China Formwork Association,100088,Beijing,China
 全文: PDF (0 KB)   HTML (1 KB)  输出: BibTeX | EndNote (RIS)      背景资料
摘要 早拆模板可提早拆模,加速模板周转,减少模板用量,降低模板施工费用,世界各国都在积极采用和发展早拆模板技术;国外早拆模板体系支柱大多采用钢支柱或铝合金支柱,较扣件钢管方便、安全、施工速度快,经济效益明显;我国早拆模板技术对早拆柱头作了改进,有滑动式早拆柱头、螺杆式柱头以及螺杆与滑动结合的柱头。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
糜嘉平
关键词早拆模板   早拆柱头   钢支柱   铝合金支柱   螺杆式柱头   滑动式柱头     
Abstract: Early-strip formwork may be stripped early to accelerate the formwork circulation, reduce the number of formworks required and construction cost of formwork. The early-strip formwork technique is actively adopted and developed around the world. In foreign countries, the early-strip formwork system adopts steel pillar or aluminium alloy pillar, which has higher convenience and safety, faster construction and better economic benefit than fastener steel tube. Domestic early-strip formwork technique makes improvements to the early-strip chapiter, including sliding early-strip chapiter, screw rod chapiter and screw rod-sliding combined chapiter.
Key wordsearly-strip formwork   early-strip chapiter   steel pillar   aluminium alloy pillar   screw rod chapiter   sliding chapiter   
收稿日期: 2011-10-20;
通讯作者: 糜嘉平   
作者简介: 糜嘉平
引用本文:   
糜嘉平. 国内外早拆模板技术发展概况[J]. 建筑工人, 2011, 42(08): 686-688.
MEI Jia-Beng. Introduction on technical development of early-strip formwork both home and abroad[J]. Architecture Technology, 2011, 42(08): 686-688.
链接本文:  
http://www.jzjs.com/CN/     或     http://www.jzjs.com/CN/Y2011/V42/I08/686
 
没有找到本文相关图表信息
没有本文参考文献
[1] 纪十二. 改进早拆模板工艺的几点设想[J]. 建筑工人, 2012, 43(1): 96-97.
[2] 宫一. 改进早拆模板工艺的几点设想[J]. 建筑工人, 2012, 43(1): 98-102.
?
版权所有 © 2011 建筑技术杂志社
地址:北京市广莲路1号建工大厦A座9层,邮编100055 电话:(010)68512449 (010)63928687,63928688 e-mail:jzjs@sina.com
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn