Abstract:
Drilling and cement-soil transfusing diaphragm wall method is ameliorated on the base of SMW diaphragm wall method. The method trends to be mature through several projects. Compared with SMW diaphragm wall this method has particularity in making cement-soil slurry, pile drilling, cement-soil slurry transfusing to form wall and main material posting and so on.
Li- Dan. ON KEY TECHNOLOGY OF CONSTRUCTION IN DRILLING AND
CEMENT-SOIL TRANSFUSING DIAPHRAGM WALL METHOD[J]. Architecture Technology, 2011, 42(12): 1090-1092.