Abstract:
During the forming construction of cable dome with rigid grid, the technology of cable-strut forming and rigid grid installing is the key. The forming construction methods of cable dome build in the world are summarized, domestic research achievements in this aspect are also introduced. Based on above, a new forming method: “tower lifting with cable-strut accumulative installation and prestressed forming method” is put forward. This method can obviously reduce prestressed cable of traction distance and traction, and correspondingly the construction process is more convenient and safer.
YAN Fu-Sheng, Zong-Zhong-Ling, Guo-Zheng-Xin. RESEARCH ON CONSTRUCTION FORMING OF CABLE DOME WITH RIGID GRID[J]. Architecture Technology, 2011, 42(10): 927-930.