摘要 东南大学教学医疗综合楼工程基坑深11.8 m,支护长度430 m,采用三轴深层揽拌桩,内插预应力管桩复合挡土与止水,支护施工使用PCMW工法,取得了安全可靠、经济合理、节能环保、施工快速等良好效果。 |
|
关键词: 基坑支护
三轴搅拌桩
预应力混凝土管桩
PCMW工法
|
Abstract:
The foundation pit of General Medical Teaching Building of Southeast University is 11.8m deep and its 430 m long retaining and protection structure adopts tri-shaft deep mixed pile in which prestressed tubular pile is inserted for soil retaining and waterproof. PCMW method is used for the retaining and protection of foundation pit, and many favorable effects, such as safe, reliable, economic, reasonable, energy-saving, environmentally friendly and fast construction, etc., are realized.
|
Key words: retaining and support of foundation pit tri-shaft mixed pile prestressed concrete tubular pile PCMW method |
|
[1] |
任斌向. 古城区大型超深基坑支护施工技术[J]. 建筑技术, 2016, 47(3): 231-. |
[2] |
朱星彬,胡学军. 软土地区复杂深基坑支护结构设计
与土方开挖[J]. 建筑技术, 2015, 46(9): 837-839. |
[3] |
张向霞,黄爱军. 土层锚杆在深基坑支护中的应用研究[J]. 建筑技术, 2015, 46(6): 546-549. |
[4] |
胡韦楠. 预应力混凝土管桩桩体上浮原因分析及处理措施[J]. 建筑技术, 2015, 46(12): 1132-. |
[5] |
陈睿烨. 天津合生国际大厦深基坑栈桥中心环岛挖土施工[J]. 建筑技术, 2014, 45(7): 641-644. |
[6] |
王国庆, 郭猛. 可回收锚杆的创新及应用[J]. 建筑技术, 2013, 44(7): 652-654. |
[7] |
朱俊坡. 基坑支护工程三轴搅拌桩施工方案[J]. 建筑技术, 2012, 43(6): 548-550. |
[8] |
曹忠民,王奇松,杨一炯. 地铁基坑钢支撑架设与拆除安全监控[J]. 建筑技术, 2012, 43(6): 493-496. |
[9] |
姜志刚. 复杂环境下的桥墩基坑支护施工及监测[J]. 建筑技术, 2012, 43(4): 340-343. |
[10] |
董 猛. 复合土钉支护在深圳软件园中的设计应用[J]. 建筑技术, 2012, 43(4): 363-364. |
[11] |
杨勇勇,石文广,赵宇,尚岳全. 采用三轴搅拌桩联合降水施工隧道联络通道的施工工法[J]. 建筑技术, 2012, 43(3): 206-209. |
[12] |
吴丽华,曹昕. 钢板桩与组合钢管内支撑在大跨度深基坑施工中的应用[J]. 建筑技术, 2012, 43(3): 236-238. |
[13] |
张耀龙,李克江,王晖,刘建平,李刚. 天津金德园地下工程综合施工技术[J]. 建筑技术, 2012, 43(3): 198-203. |
[14] |
鄢广相. 型钢水泥土搅拌墙施工技术[J]. 建筑技术, 2012, 43(3): 238-240. |
[15] |
李 丹. 钻孔后注浆工法连续墙施工关键技术研究[J]. 建筑工人, 2011, 42(12): 1090-1092. |
|
|
|
|
|