摘要 顶升模板系统巳在高层建筑施工中广泛应用,广州东塔项目施工中,结合超高层建筑核心筒的施工方案设计,采用顶升模板支撑体系,从模板选型、相应支撑系统设计、整体受力分析等方面进行支撑系统设计和内力计算,取得了节省人工、提高工效、降低风险的效果。 |
|
关键词: 顶升模板
核心筒
内力计算
|
Abstract:
Jack-raising formwork system has been extensively used in high-rise construction. During construction of Guangzhou East Tower, jack-raising formwork supporting system is adopted with the core tube construction scheme design of super high-rise, to design the supporting system and calculate the internal force on the aspects of formwork selection, design of relevant supporting system, overall force analysis, etc. Favorable effects are obtained, such as saving of labor, high construction efficiency and low risk.
|
Key words: jack-raising formwork core tube internal force calculation |
|
[1] |
王军,钟学宏,赵军,黄亚均,顾乃荣,徐建彬. 超高层建筑低位顶升模架体系应用[J]. 建筑技术, 2016, 47(6): 537-. |
[2] |
刘洋洋,潘长河,赵亮,李杨. 铝框木模与钢大模组合模板体系在超高层核心筒结构施工中的应用[J]. 建筑技术, 2015, 46(8): 710-712. |
[3] |
吴 华,胡 京,唐永讯,张莉莉,李玉建. 超高层核心筒液压爬模施工技术[J]. 建筑技术, 2015, 46(2): 146-. |
[4] |
高 帅, 柴 婷. 蒙古某井塔外墙爬模施工成套技术研究与应用[J]. 建筑技术, 2014, 45(8): 710-713. |
[5] |
姚俊斌, 吴学军, 聂建国, 白小军, 李海生. 超高层劲性钢筋混凝土结构竖向错层阶梯施工安全性研究[J]. 建筑技术, 2014, 45(2): 135-138. |
[6] |
刘文航, 郝鹏远, 孟德才. 钢框架-钢筋混凝土筒体液压爬模技术控制要点[J]. 建筑技术, 2014, 45(12): 1083-1085. |
[7] |
任海波, 李 桐, 张海峰. 液压爬模组合钢模板与传统木模翻模结合施工技术[J]. 建筑技术, 2012, 43(8): 713-716. |
[8] |
潜宇维,孙京河,顾学庆. 超高层建筑核心筒液压爬模施工及质量控制[J]. 建筑技术, 2012, 43(6): 511-514. |
[9] |
王 斌,冯 涛. 超高层建筑核心筒液压爬模施工技术[J]. 建筑工人, 2011, 42(09): 797-800. |
[10] |
王 斌,冯 涛. 超高层建筑核心筒液压爬模施工技术[J]. 建筑工人, 2011, 42(09): 797-800. |
|
|
|
|