Abstract:
Based on related monitoring requirements for debugging of geothermal heat pump air conditioning system and domestic hot-water system of a project, the debugging monitoring method is introduced on the following aspects, including operation requirement of domestic hot-water system, key points for monitoring on system debugging and analysis on debugging result, etc. To ensure the energy conservation and emission reduction required in design can be satisfied, the system shall be debugged in subzones and subsystems before joint debugging. Problems detected in debugging shall be summarized and corrected timely, so as to provide references for debugging monitoring of similar projects.
DING Yu-nan,DING Nan-yu. MONITORING ON DEBUGGING OF GEOTHERMAL HEAT PUMP AIR CONDITIONING SYSTEM AND DOMESTIC HOT-WATER SYSTEM[J]. Architecture Technology, 2012, 43(4): 310-312.