Abstract:
The roof truss of Shougang Group's main building for high-strength machine steel production line needs to be dismantled and this project witnesses the biggest dismantlement workload in China. After careful planning, scaffold is erected as a mobile construction platform on the main beam of the existing double-beam crown block to dismantle the truss in the air. Favorable construction effects are obtained.
RUAN Xin-wei. DISMANTLEMENT TECHNIQUE OF ROOF TRUSS OF SHOUGANG GROUP'S MAIN BUILDING FOR HIGH-STRENGTH MACHINE STEEL PRODUCTION LINE[J]. Architecture Technology, 2012, 43(5): 415-418.