Abstract:
According to the requirements of Drawing Rules of Plane Overall Design Method and Structure Drawings for Concrete Structure Construction (Cast-in-place Concrete Frame, Shear Wall, Beam and Slab) (11G101-1), beam roof (floor) slab reinforcement, including slab bottom through reinforcement (or non-through reinforcement), slab top through reinforcement, support through reinforcement, distributed reinforcement in support non-through reinforcement and temperature reinforcement at middle of slab top (crack-resistant and temperature-resistant structural reinforcement), are researched on the aspects of construction and budget for changes at support node and changes in reinforcement layout and overlap length. Key construction points and workload calculation for budget of such kind of reinforcement are analyzed.
LI Mao-ying,ZENG Qing-jun. RESEARCH ON CONSTRUCTION AND BUDGET OF BEAM ROOF (FLOOR) SLAB REINFORCEMENT IN SPECIFICATION FOR NEW PLANE OVERALL DESIGN METHOD[J]. Architecture Technology, 2012, 43(5): 453-455.