Abstract:
Two-in-one diaphragm wall which is 1000mm thick is used in foundation pit of a highrise office building in Zhengzhou city, and a row of D850 @ 600 triaxial mixing piles are set at both sides to strengthen the diaphragm wall. Construction flow is controlled strictly and many technical measures are adopted to ensure the quality of foundation pit support.
ZHU Jun-po. CONSTRUCTION SCHEME OF TRIAXIAL MIXING PILE IN BUILDING FOUNDATION PIT SUPPORT ENGINEERING[J]. Architecture Technology, 2012, 43(6): 548-550.