Abstract:
Station houses along Beijing-Shanghai railway cover a large scope under complex geological conditions. After construction of test well, engineering geological conditions are proved and optimal drilling scheme is established under different geological conditions. Different drills are used during the construction to successfully improve drilling efficiency, to shorten construction period and to obtain obvious economic benefit.
DAI Rong-li. CONSTRUCTION TECHNIQUE FOR GEOTHERMAL HEAT PUMP DRILLING OF BEIJING-SHANGHAI HIGH-SPEED RAILWAY STATION HOUSE[J]. Architecture Technology, 2012, 43(6): 565-566.