Abstract:
During pipe jacking construction of Yuhang Renhe Water Plant project of Hangzhou passing through Beijing-Hangzhou Grand Canal, technical measures are adopted according to geological conditions. 180m-long steel pipe is jacked in silty clay stratum without relay chamber and fraction-reducing measure. Successful one-off jacking is realized and expected quality control aims are reached.
ZHANG Hong-tao,ZHENG Zhong. QUALITY CONTROL FOR PIPE JACKING CONSTRUCTION OF WATER SUPPLY PIPELINE PASSING THROUGH BEIJING-HANGZHOU GRAND CANAL[J]. Architecture Technology, 2012, 43(9): 791-793.