Abstract:
New terminal building of Linyi Airport adopts plane steel pipe truss structure and the process of steel pipe component is successfully completed through intersecting line cutting in wide-span plane steel pipe truss, cold bending control of steel pipe and truss assembly. After comparison and selection among different schemes, temporary support and crane transposition lifting are adopted to guarantee the lifting quality and construction schedule.
LI Tai-quan,SU Jian-cheng,QIU Guo-feng. CONSTRUCTION TECHNIQUE FOR PIPE TRUSS OF LINYI AIRPORT TERMINAL BUILDING[J]. Architecture Technology, 2012, 43(10): 873-876.