Abstract:
The outdoor track and field athletic field belongs to quite special kind of items of basic construction, in the project implementation process, extremely easy to have the management difficult aspect, also easy to have the project quality question. This article through an outdoor standard track and field athletic field the key question which exposes in the construction process, from the verification construction drawing design, closes strictly raw material and strengthens the job location key link to control three aspects to the project implementation effective project management and the quality, the construction cost control, achieves the design standard, had guaranteed the construction quality.
XIAO Feng,JIANG Ming-Hui,XU Cheng et al. OUTDOOR STANDARD TRACK AND FIELD ATHLETIC FIELD PROJECT MANAGEMENT[J]. Architecture Technology, 2012, 43(10): 949-951.