项目成本管理控制在工程中的应用 |
|
|
|
ENGINEERING APPLICATION OF PROJECT COST MANAGEMENT AND CONTROL |
|
文章导读 null |
|
摘要 为了遏止因各种原因形成的工程成本亏损,在施工中通过加强材料控制、加强对劳务、分包施工的成本控制、加强技术部门与商务部门的密切沟通、加强大型机械租费的管理、为合同中潜在亏损点索赔,处理好公共关系,为项目部争取利润。 |
|
关键词: 成本管理
限额
受益率
索赔
|
Abstract:
In order to avoid engineering loss caused by various reasons, potential loss in contract could be claimed, public relation be maintained and profit be created for project department through strengthening of material control, cost control of labor and subcontract construction, favorable communication between technical department and business department, as well as management of large machine rental.
|
Key words: cost management quota benefit factor claim |
|
[1] |
赵占军. BIM技术在施工阶段的成本控制管理[J]. 建筑技术, 2016, 47(6): 567-. |
[2] |
马铁山, 李耸耸. 我国海外EPC项目采购阶段的成本管理[J]. 建筑技术, 2014, 45(4): 364-367. |
[3] |
张 力. 建设工程变更索赔实施策略[J]. 建筑技术, 2012, 43(10): 947-948. |
[4] |
田卫国,熊建伟. Excel在国际工程索赔中的应用[J]. 建筑工人, 2011, 42(08): 737-739. |
[5] |
韩 青,王一行,王滨夫,张国伟. 现场平浇预制结构建造技术应用前景[J]. 建筑工人, 2011, 42(08): 740-741. |
[6] |
徐 蓉 王旭峰 徐 伟. “最低价中标”中规避合同风险问题的研究[J]. 建筑技术, 2004, 35(2): 148-150. |
|
|
|
|
|