Abstract:
All residential buildings on plot D of Vanke COFCO Holiday Scene Project are of assembled shear wall structure and adopt integral assembled structure installation system. During construction, many new techniques are adopted, such as multifunctional steel beam balance lifting technique, adjustable inclined supporting correction technique, wall panel coupler grouting converse filling process and application technique of mechanical load bearing bracket, etc. In order to solve the problems in practical application of these new technique in construction, prefabrication subject research group is established to research process, transportation and lifting of prefabricated structure, safety enclosure and node construction process, successfully taking the advantages of mass production, accelerating the construction schedule, ensuring construction quality, saving engineering construction cost, improving residential quality and realizing industrialized construction of residential building.
YANG Hai-wen,WANG Li-jun,GUO Shuang-chao et al. INTEGRAL INSTALLATION AND CONSTRUCTION TECHNIQUE OF ASSEMBLED STRUCTURE[J]. Architecture Technology, 2013, 44(1): 28-30.