Abstract:
The foundation pit of a 36-storey building is 17m deep and there are multiple pipelines and buildings within the influencing scope where the groundwater level depth is 7.40m to 8.70m. After calculation and analysis, circulation drill boring large-diameter pipe well dewatering technique is adopted. Construction practices show that number and arrangement of dewatering wells of such technique could satisfy the requirements of underground engineering construction.